Bear Branch Action Plan

Join Our Newsletter

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.

Project Summary

The Severn River Association (SRA) plans to develop a Bear Branch Action Plan (BBAP), contracting with the Center for Watershed Protection. This project will identify and prioritize restoration opportunities within the Bear Branch to reduce nutrient and sediment pollution. By assessing existing conditions and engaging the community, we aim to create a long-term strategy for a healthier watershed.

Goals and Objectives

The primary goals of the BBAP are:

  • Develop a long-term strategy to address nutrient and sediment pollution in the Bear Branch subwatershed.
  • Identify viable stormwater management and Green Stormwater Infrastructure (GSI) projects.
  • Prioritize projects based on pollution loads, location, cost-effectiveness, community support, and community needs.
  • Achieve substantial reductions in nitrogen, phosphorus, and sediment loads to the Severn River.

Project Motivation

The Severn River is listed as impaired under the Clean Water Act, necessitating action to reduce nutrient and sediment pollution. This project aligns with Anne Arundel County’s Municipal Separate Storm Sewer Systems (MS4) and Total Maximum Daily Loads (TMDL) requirements. The BBAP will accelerate efforts to meet these regulations and improve overall water quality.

Where is Bear Branch?

The Bear Branch Subwatershed is located in Millersville, Maryland. It is geographically defined by:

  • East West Blvd to the North
  • Veterans Hwy to the West
  • Benfield Blvd cuts through the subwatershed
  • Empties to the west of Cold Springs

Potential Restoration Opportunities

The project will explore various restoration opportunities, including:

  • Stormwater management retrofits
  • Green Stormwater Infrastructure (GSI) installations (e.g., bioretention, bioswales)
  • Riparian plantings and buffer restoration
  • Stream restoration

Environmental Benefits

The BBAP will lead to numerous environmental benefits:

  • Reduced nutrient and sediment pollution in the Severn River
  • Improved water quality and habitat for aquatic life
  • Enhanced biodiversity
  • Increased climate resilience
  • Mitigation of flooding and erosion
  • Upland protection for Critical Area

Community Benefits

This project will provide several benefits to the local community:

  • Increased awareness of water quality issues and solutions
  • Volunteer opportunities for residents
  • Community stakeholder workshops for input and feedback
  • Improved access to nature and recreational spaces
  • Use of a community lens to ensure that all segments of the watershed community are considered

Anticipated Outcomes

The BBAP aims to achieve:

  • Reduction of 2,022 lbs of Total Nitrogen (TN) per year
  • Reduction of 161 lbs of Total Phosphorus (TP) per year
  • Reduction of 111.5 tons of Total Suspended Sediment (TSS) per year
  • A prioritized list of at least 10 restoration projects
  • Conceptual designs for top-priority projects
  • A comprehensive action plan that meets Clean Water Act requirements

We Want To Hear From You!

Community engagement is crucial to the success of the BBAP. We encourage residents, businesses, and stakeholders to participate in:

  • Community stakeholder workshops
  • Volunteer events
  • Providing feedback and local knowledge

Your input will help shape the project and ensure it addresses the community’s priorities and concerns.

Timeline

  • November 2025: Apply for WAGP Grant
  • March 2026: Hear from WAGP
  • June 2026: Project Kickoff
  • July 2026: Gather and review data
  • August 2026: Desktop assessment of BMP potential
  • October 2026: Field investigation
  • November 2026: Stakeholder and Steering Committee Meetings
  • December 2026: Project ranking
  • March 2027: Concept designs for top three ranked project
  • May 2027: Draft and final Bear Branch Action Plan report

Image Gallery

Click here to view the Image Gallery