At Severn River Association (SRA) we help communities improve their local environment and restore the Severn River. Good communication is really important. This page will update you about what’s happening with our project in the headwaters of College Creek. Please email Ben Fertig, ben@severnriver.org with questions. Click on any picture to make it bigger or to download.

SRA is a 501c3 non-profit organization with experience and success at pursuing funding and project management for pollution reduction and environmental restoration. Our vision is a thriving Severn River by 2050, and our mission is to connect the people who live, work, and play on the Severn River to restore and protect it for all of our communities. 

Project Origin

Severn River Association (SRA) was introduced to this project through Save Our Trees, a program of Watershed Stewards of Anne Arundel County. SRA participated in an invasive species removal event in February 2025 and noticed the potential for additional restoration work and public access to natural areas in the heart of the City of Annapolis. Nearby, the City of Annapolis is working on stabilizing an outfall between the Brewers Hill Cemetery and the National Cemetery along West St. The City is also planning the West East Express Trail in the area. Additional investigation has thus led to the collaboration with various agencies within the City of Annapolis as well as the Germantown-Homewood community and Save Our Trees to arrive at a multi-purpose project that will treat stormwater, reduce nutrient and sediment pollution, stabilize stream banks, reconnect the headwaters to its floodplain, replace invasive species with native species, support migratory bird habitat, maintain mature tree canopy, increase access to nature, and provide opportunities for recreation, environmental education, and green job training. 

Erosion from the outfall at Woodlawn Ave. in the Germantown-Homewood neighborhood has been identified as an area of need in two separate reports. The City of Annapolis hired BayLand to conduct an Outfall Risk Assessment (2024) that also assessed associated stream reaches. The stream reach on the south side of the Poplar Trail (CGC008/7) was ranked the #3 priority to restore and the stream reaches downstream of the outfall at Woodlawn Ave. (CGC006 and 007/7) were ranked as the #5 priority to restore. The outfall on the south side of the Poplar Trail (#304) was badly corroded, with erosion behind the mouth of the pipe and ranked as the 8th priority to address.

Back in 2016, the City published a Stormwater Management Inventory and Watershed Implementation Plan (contracting with AECOM) that identified this area (CityRequest_01) as the #4 priority restoration needed of the top 16 projects that were selected for concept development. See the Documents section of this page for additional information from that report.

Project Summary

A major goal of the project as it is currently proposed is to stabilize two stormwater outfalls and stream banks to decrease erosion and improve water quality in the headwaters of College Creek, which flows to the Severn River. The Severn River is “impaired” under the federal Clean Water Act for nitrogen, phosphorus, sediments and other pollutants. The College Creek subwatershed is listed as priority #18 (of 108 subwatersheds) in the Severn River Action Plan. With stabilization of outfalls and stream banks, we aim to improve water quality by decreasing nutrient and sediment pollution, preventing erosion, preserving mature forest and wetland habitats and replacing invasive species with native species while also increasing opportunities to access nature. SRA is collaborating with the City of Annapolis, Save Our Trees, and the Germantown-Homewood community to further define project goals and desired outcomes. This project must be coordinated with other concurrent projects in the area. SRA will select and work with a contractor to achieve an engineering design that meets the above goals and to obtain the necessary federal, state, and city permits. 

Proposed Area 

The project area is bounded by Woodlawn Ave. on the west, Poplar Ave, Poplar Trail and the Annapolis Police Department to the north, Taylor Ave to the east, and West St. to the South, excluding the United States National Cemetery. There are multiple stormwater outfalls that supply water to the headwaters of College Creek. These have caused stream bank erosion. The stormwater inlet at Woodlawn Ave feeds into the small stream and flows down towards the Annapolis Police Department and into College Creek. Additional flow comes directly from the end of Brewer Ave. Near the outfall at Woodlawn Ave., there is about three feet of erosion. The outfall below the Poplar Trail has become severely corroded and caused severe bank erosion near the outfall. There is opportunity for stream restoration to reconnect the incised stream to the floodplain. ‘

The area is thickly vegetated, although much of it is invasive. There is a need to aggressively address invasive species. Invasive management must be a large portion of the long term maintenance plan for this site. 

Project Environmental Benefits

  • Stabilize stream bank to prevent further erosion and incision
  • Provide a cost-effective, nature-based solution to defend against erosion
  • Decrease harmful effects of flooding
  • Decrease nutrient & sediment pollution in the Severn
  • Increase biodiversity
  • Remove invasive species
  • Preserve and enhance wildlife habitat
  • Community engagement
  • Environmental education
  • Public access to nature
  • Green job training

Timeline

Note that this timeline will be updated.  

  • February 2025 – SRA participated in an invasive species removal event organized by Save Our Trees
  • August 2025 – SRA developed a Request For Proposals to help assess the need for restoration and if so, to define parameters. SRA coordinated with the City of Annapolis with respect to other nearby projects
  • September 2025 – Bids received. 
  • November 2025 – SRA submit proposal for design and permitting to the Chesapeake Bay Trust Watershed Assistance Grant Program         
  • March 2026 – hear back from CBT
  • April 2026 – if awarded, begin design process
  • April 2027 – apply for construction funding
  • September 2027 – hear if construction funding awarded

Maintenance

Once constructed, SRA will be responsible for maintaining the project for the first five years. 

Maintenance obligations are specified in the Stormwater Improvement Maintenance Agreement with the City of Annapolis. and include: 

  • Weeding, mulching (if/as needed), trash removal, and general aesthetic maintenance
  • Vegetation: 85% survival, and it can’t be removed or modified without approval
  • City of Annapolis can, during business hours and with advanced notice, verify & inspect the project to ensure maintenance, and this level of access runs with the land
  • City of Annapolis receives the water quality improvement credits
  • Post-construction, can’t alter the project without approval

Photos

Check out the Google photo album for photos of the sites. Photos will be added to track the progress. 