At SRA our job is to help communities improve their local environment and restore the Severn River. Good communication is really important. So we’ve put together this page to let you know about what’s happening with the stormwater management project at the Forward Brewing Company. If you ever have any questions or concerns, please let Mollie know! mollie@severnriver.org
Click on any picture to make it bigger or to download.
SRA is a 501c3 non-profit organization with experience and success at pursuing funding and project management for pollution reduction and environmental restoration. Our vision is a thriving Severn River by 2050, and our mission is to connect the people who live, work, and play on the Severn River to restore and protect it for all of our communities.
Forward Brewing Company (FBC) identified concerns about stormwater runoff at their Eastport location and its impact on Spa Creek, which is impaired under the federal Clean Water Act for nutrients and sediment. In coordination with the Chesapeake Bay Trust, FBC brought this opportunity to the Severn River Association (SRA) to explore solutions.
SRA conducted a site visit and determined the project site is well-suited for a stormwater Best Management Practice (BMP) within the Critical Area, with strong potential for both water quality improvement and public education. FBC agreed to partner with SRA, which will seek funding, and coordinate design, permitting, and implementation.
The primary goal of the project is to treat stormwater runoff and reduce nutrient and sediment pollution entering Spa Creek. Additional goals include increasing native habitat and biodiversity and enhancing community awareness through visible green infrastructure and educational signage.
Great question!
As you’re probably already well aware, storms can cause flooding and erosion. Forward Brewing in Eastport experiences this a lot with all of the impervious surfaces. Does something like this look familiar?
When water runs downhill it carries sediments (to which phosphorus ‘sticks’), dissolves nitrogen and carries these nutrients with it, down to the Severn and the Chesapeake Bay. Nutrients sound good, right? We need nutrition after all.
Yes—but to a point.
When there are too many nutrients (either nitrogen or phosphorus), it spurs algae populations to grow out of control. Nitrogen and phosphorus are basically what’s in plant fertilizer, as many gardeners know. The algae population grows so much that it uses up all the nutrients, but then the algae ‘starve’ to death and sink to the bottom of the water. The algae then decompose and the bacteria decomposing the algae use up oxygen, creating dead zones where oxygen levels are too low for most organisms (e.g. rockfish, oysters, and crabs) to survive. Overgrowth of algae and dead zones decrease biodiversity which in turn impacts humans and other organisms that feed and rely on these aquatic organisms.
SRA water quality monitoring in the Severn River records low oxygen levels frequently during summer that indicates the presence of dead zones throughout the river, including Spa Creek (our number 2 priority area). This is a problem going on in your backyard.
This project will decrease the untreated stormwater runoff that contributes to these dead zones.
The overall goal of this project is to improve water quality in Spa Creek and the Severn River by reducing nitrogen, phosphorus and sediment pollution from stormwater runoff. So, the primary objective is to design and implement a nature-based stormwater management solution that captures, slows, and treats runoff through infiltration practices such as a rain garden and permeable pavers. By partnering with Forward Brewing Company this project will serve as a visible model for other businesses and communities to implement similar solutions. Ultimately, the project will increase native habitat and biodiversity while also enhancing community awareness through education and signage.
SRA is currently seeking grant funding for this project. Funding could be awarded in full, in part, or not at all. If unsuccessful, SRA will try again. A ‘no’ is not final or forever.
There are four stages to the project:
SRA has requested design build funding through Chesapeake Bay Trust. Forward Brewing Company will be consulted at each stage of design and will provide written approval at the 30%, 60%, 90% and 100% stages prior to moving forward. The approach for stormwater control is to construct a rain garden at the rear of the parking lot adjacent to the existing shed as outlined in the RFP. Two concepts have been developed for the rain garden (the garden is somewhat larger in the second concept).
Once constructed, SRA will be responsible for maintaining the project for the first five years. SRA anticipates contracting with GreenLift (www.greenlift.net), which provides green job training for returning citizens. After five years, responsibility for maintenance will be transferred to the property owner.
Maintenance obligations are specified in the Stormwater Improvement Maintenance Agreement with the City of Annapolis and include:
SRA estimates maintenance costs to be about $3,600 annually if contracted out, but many communities opt to hold volunteer days annually (often around Earth Day). SRA can help organize volunteer days if desired.
Task 1 (July 2026)– Project initiation, Natural Resource Inventory, and Field Assessments
Task 2 (July 2026)– Detailed Field Survey and Base Map Preparation
Task 3 (July – August 2026)– 65% Preliminary Design
Task 4 (September – October 2026)– 90% Prefinal Design Plans
Task 5 (October – December 2026)– Permitting and 100% Final Construction Documents
Task 6 (December 2026)– Construction timeline will be developed with the selected firm and SRA and is expected to take about two months.
Let SRA know your thoughts about the project. We will update this section with how these will be addressed.
Check out the Google Photos for photos of the sites. Photos will be added to track the progress.