Shoreline and Stormwater at The Point

Join Our Newsletter

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.

Severn River Association (SRA) helps communities improve their local environment and restore the Severn River. This page provides updates on the potential shoreline and stormwater project at The Point on Spa Creek. Please email Ben Fertig, Restoration Manager, at ben@severnriver.org with questions or concerns.

Click on any picture to make it bigger or to download.

SRA is a 501c3 non-profit organization with experience and success at pursuing funding and project management for pollution reduction and environmental restoration. Our vision is a thriving Severn River by 2050, and our mission is to connect the people who live, work, and play on the Severn River to restore and protect it for all of our communities.

Project Origin

The beach, marina, and walking areas experience flooding during high tide and storm events. Additionally, there are portions of the parking lot and common areas that pool substantial amounts of water after rain storms. Multiple untreated stormwater drains dump polluted runoff directly into the Severn River. Treating this pollution was identified as a potential opportunity to improve Spa Creek water quality as early as 2007 in the Spa Creek Tidal Subwatershed Assessment Report prepared by the Center for Watershed Protection for the Spa Creek Conservancy.

SRA conducted a site visit and determined that the site is well-suited for a living shoreline and stormwater Best Management Practice (BMP), with strong potential for both water quality improvement and public education. The Point is located in the Spa Creek subwatershed, which is the second highest priority area for restoration in the Severn River watershed (as outlined in the Severn River Action Plan). The Severn River has been declared “impaired” under the Clean Water Act for nitrogen, phosphorus and sediments, and stormwater is the largest source of pollution in the river. By implementing this project, The Point Condominiums will help to effectively retain property values, increase resilience against tidal flooding, reduce stormwater-associated pollution and maintain control over shoreline access.

Project Goals & Summary

The primary goal of the project is to limit erosion and reduce pollutants flowing into the Severn River by implementing restoration practices throughout the The Point community. By increasing shoreline resiliency and treating stormwater runoff, we aim to protect community property, reduce nitrogen, phosphorus, and sediment pollution inputs into the river, and contribute to Anne Arundel County’s TMDL credits and MS4 permit requirements. Other objectives of this project include increasing native habitat and biodiversity and enhancing community awareness through visible green infrastructure.

SRA is currently seeking grant funding for this project. Funding could be awarded in full, in part, or not at all. If unsuccessful, SRA will try again. A ‘no’ is not final or forever.

There are four stages to the project:

  1. Identifying community needs and interests
  2. Engineering design and permitting
  3. Construction
  4. Maintenance

Project Environmental Benefits

  • Tax incentives
  • Reduced shoreline flooding
  • A safer and healthier Severn River
  • Reduced nitrogen and phosphorus pollution, reducing algae blooms (‘dead zones’)
  • Reduced suspended solids (TSS), improving water clarity and reducing sedimentation
  • Filter other pollutants e.g. hydrocarbons or heavy metals
  • Increased native vegetation, habitat, biodiversity, and pollinators
  • A stronger, more resilient environment

Living Shorelines

Living Shoreline Toolkit

Living shorelines create open spaces along a river’s shoreline, mimicking Mother Nature’s natural defenses against erosion. Living shorelines can solve typical erosion problems found on the Severn River. Their design not only protects the shoreline and cliffs from storm and powerboat wave energy, but also rebuilds the natural sandy shoreline that is greatly affected due to storms, rising sea level, and wave energy.

What’s the Big Deal About Stormwater, Anyway?

Great question!

As you’re probably already well aware, storms can cause flooding and erosion. Properties with more impervious surfaces experience increased flooding. Does something like this look familiar?

When water runs downhill it carries sediments (to which phosphorus ‘sticks’), dissolves nitrogen and carries these nutrients with it, down to the Severn and the Chesapeake Bay. Nutrients sound good, right? We need nutrition after all.

Yes – but to a point.

When there are too many nutrients (either nitrogen or phosphorus), it spurs algae populations to grow out of control. Nitrogen and phosphorus are basically what’s in plant fertilizer, as many gardeners know. The algae population grows so much that it uses up all the nutrients, but then the algae ‘starve’ to death and sink to the bottom of the water. The algae then decompose and the bacteria decomposing the algae use up oxygen, creating dead zones where oxygen levels are too low for most organisms (e.g. rockfish, oysters, and crabs) to survive. Overgrowth of algae and dead zones decrease biodiversity which in turn impacts humans and other organisms that feed and rely on these aquatic organisms.

SRA water quality monitoring in the Severn River records low oxygen levels frequently during summer that indicates the presence of dead zones throughout the river. This is a problem going on in your backyard.

This project will decrease the untreated stormwater runoff that contributes to these dead zones. Additionally, the project will help curtail the flooding, erosion, and sedimentation in the community.

Project Funding, Design, and Construction

SRA will seek grant funding through the Chesapeake Bay Trust (CBT) Watershed Restoration and Forestry grant program. SRA anticipates submitting the grant proposal when it opens in Spring 2027.

The Point will be consulted at each stage of the design process and will provide written approval at the 30%, 60%, 90% and 100% stages prior to moving forward. The approach for stormwater treatment and shoreline erosion control is still being discussed to determine the scope of the project.

Maintenance

Once constructed, SRA will be responsible for maintaining the project for the first five years. After five years, responsibility for maintenance will be transferred to The Point.

Maintenance obligations are specified in the Stormwater Improvement Maintenance Agreement with the City of Annapolis and include:

  • Weeding, mulching (if/as needed), trash removal, and general aesthetic maintenance
  • Vegetation: 85% survival, and it can’t be removed or modified without approval
  • City can, during business hours and with advanced notice, verify & inspect the project to ensure maintenance, and this level of access runs with the land
  • City receives the water quality improvement credits
  • City provides structural maintenance (anything really big)
  • Post-construction, can’t alter the project without approval

Many communities opt to hold volunteer days annually (often around Earth Day). SRA can help organize volunteer days if desired.

Timeline (if awarded)

The estimated start date for this project begins as soon as funding is awarded, approximately May/June 2027. Once known, an anticipated project duration and timeline will be included on this webpage.

Community Questions & Concerns

​​Let SRA know your thoughts about the project. We will update this section with how these will be addressed.

Photos

Check out the Google photos for photos of the sites. Photos will be added to track the progress.

Darker blue indicates wetter areas, which include the low-lying shoreline and walking area that is frequently flooded.

There are substantial amounts of impervious surfaces within The Point, including buildings, roads, parking areas, sidewalks, decks, etc.

All of The Point is situated within the Critical Area.

Documents

Community Stormwater and Erosion June 2025-2
Living Shoreline at President Point